§ 62-1468. Same—Administrative filing of final engineered RPUD development plan; site plans.  


Latest version.
  • (a)

    Time limits. The developer shall have three years from the date of approval of the RPUD development plan in which to file a final engineered RPUD development plan, and receive building permits for the entire property, or any stage thereof. At the request of the developer, the zoning official may extend the period required for filing of such plans for successive periods of one year each unless and until the comprehensive plan has been amended causing the RPUD development plan to become inconsistent with the comprehensive plan.

    (b)

    Submittal procedure; submittals; recording of final engineered RPUD development plan.

    (1)

    Submittal procedure.

    a.

    Submittal; coordination with county agencies.

    1.

    The other county departments and agencies which shall be contacted for guidance prior to submittal of a final engineered RPUD development plan are the zoning office, the land development department public safety, the public works department, environmental health services, the MPO bike and pedestrian coordinator, and the Brevard County Natural Resources Department. The applicant shall have the PZ Form 100 initialed by each department and division contacted.

    (2)

    Scope and contents of final engineered RPUD development plan; recording of final engineered RPUD development plan; site plans. The final engineered RPUD development plan may be submitted for the entire planned unit development or any stage, or tract, designated on the RPUD development plan containing a minimum of seven acres. A final development plan, in addition to containing the exhibits, schedule, information and documents required in subsection (b)(2)a of this section, shall conform to the requirements for site plans and requirements of sections 62-1461—62-1470.

    a.

    Exhibits; required information. The following exhibits shall be attached to the final engineered RPUD development plan:

    1.

    Final engineered RPUD development plan. The location and dimensions of each primary residential, secondary nonresidential and open space/recreational tract, including each tract's points of ingress and egress. The legal description of each of such tracts and the specific number of units, including the range of unit types to be constructed within each tract, shall be specified. These items will be affixed to the original mylar drawing for recording purposes.

    2.

    The plans shall show the following:

    i.

    The order of construction of the tracts and blocks as delineated in the stage on the RPUD development plan.

    ii.

    The plan detail and order of the construction and improvement of common open space within the stage, including bicycle pedestrian circulation systems, greenways, complementary buildings, or playing courts.

(Ord. No. 2000-61, § 9, 12-7-00)