§ 62-2450. Application requirements.
Permit level III applications shall include the following:
(1)
Application fee.
(2)
Conditional use permit application (See section 62-1953).
(3)
Complete zoning package including one copy of a full sized reproducible fully dimensioned site plan, signed and sealed by a registered land surveyor, engineer or architect. The site plan must show all existing and proposed structures on the property including the tower and equipment building(s), structure heights, parking, ingress/egress, landscaping, refuse, screening or buffering and storm water retention areas as well as tower elevations from the front, rear and sides, including height, style, type and number of antennas to be installed. The legend shall include NAD83 latitude and longitude of the proposed tower and state plane coordinates and should be submitted in paper and electronic format.
(4)
Complete building permit application.
(5)
Complete site plan application (See sections 62-3200—62-3207).
(6)
Specific application requirements for new towers (See section 62-2451).
(7)
Specific application requirements for broadcast towers (See section 62-2452).
(Ord. No. 2014-30, § 39, 10-2-14)