§ 62-4459. Certification of compliance.  


Latest version.
  • Within 60 days of the completion of the private lake, the applicant shall provide the director a certified statement that the lake was constructed to the proper size and side slope, and that the correct percentage cover of vegetation has been planted according to the conditions of the permit. The certification shall be provided by a professional land surveyor or professional engineer. For private lakes less than five acres in size, an affidavit indicating that the lake was constructed to the proper specifications shall be provided to the director by the applicant.

(Code 1979, § 14-113.8)